Case Study: mWing Pedestrian Speed Gate Installation in Saudi Arabia
Arabian Centers is the leading owner, operator and developer of contemporary lifestyle centers in Saudi Arabia. For over a decade, the Company has provided customers with a complete range of high-quality lifestyle centers up to international standards, located in the most attractive areas of the country to satisfy all shopping needs and market requirements.
Today, Arabian Centers has a portfolio of 21 assets strategically located in 11 major Saudi cities. The Company operates some of the most iconic lifestyle centers, including Mall of Arabia, Mall of Dhahran, and Nakheel Mall, which was recognized at the Arab Luxury World Forum in 2017 as being consumers' favorite shopping mall in Riyadh. The Company’s lifestyle centers have more than 4,300 stores and host more than 109 million visitors.
The challenge
Arabian Center HQ, management office tower of U-Walk Mall in KSA was looking for a touchless solution to manage their access control for employees from the basement parking.
The Arabian Center needed speed gates to control the staff and visitor flow entering and exiting their offices from the underground parking entrance.
The requirements
The Arabian Center required a solution that allowed staff easy access and to prevent other people from accessing the area without authorization. As an extra provision, Arabian Center required a second level of security after gate barrier access into the parking basement to ensure only authorized personnel had access to the Arabian Centre offices.
The solution
The solution was to install pedestrian speed gates to manage access control.
Installation was carried out by Quadra-Tech and IDEMIA supplied wave readers as touchless access reader integration. Total number of lanes: 16 mWing wing gates by FlowMotion®.
- Installed products: 16 mWing wing gates
- Location: U-walk, Arabian Centre, KSA
- Installation period: 2021
- Local Installer: Quadra-Tech